Project Management Consultancy

Sr. NoProject NameLength KmHighway ClassificationProject Cost, CrClient
1Project management consultancy services to EPC contractor for Panvel Indapur section of NH-66 CH 0.000 to 84.000844-Lane Divided Carriageway500.0 Cr.JMMIPL
2Project management consultancy for Design & construction of elevated road between Thane Belapur Road to NH41.6Elevated Road/Flyover135.2 Cr.SMC Infra
3Project management consultancy for Design & construction of Flyover and Widening of road at Mumbra junction from CH 131/200 to 133/800 ON NH-42.6Elevated Road/Flyover89.6 Cr.SMC Infra
4Consultancy services for Authority’s Engineer for supervision of rehabilitation & upgradation of 2/4 lane with paved shoulders for NH section Dahegaon – Kuhi – Umred of NH – 247392 lane with paved shoulders119 Cr.PWD, NH, Maharashtra / MoRTH
5Independent Engineer Services for the Package MU-R11 Improvement to Indapur-Nizampur Mahad Karanjadi Visapur Dapoli Road SH 97 from Km 28/00 to 113/00 (excluding overlap length of 65/00 to 92/00) Dist Raigad622 lane State Highway113 Cr.PWD, Maharashtra
6Independent Engineer Services for the Package No. MU-R07 A. Improvements to Jawhar – Wada – Bhivandi – Kalyan – Karjat Road SH- 76 Km. 110/000 to 131/000 Tal. Karjat District Raigad. B. Improvement to Gavhanphata Chirner Sai Kharpada Savroli Road S.H.104 Km 0/000 to 44/600 Dist. Raigad.632 lane State Highway145 Cr.PWD, Maharashtra
7Independent Engineer Services for Improvements to SH143 to Vizor Nimgaon Pillv Itkai Dighnchi Shetfale Kole Ghatnadre SH 153 km 41/400 to 81/900 & 96/100 to 195/600 Dist Sangli (Part I Aatpadi to Salgare Km 65/503 to km 135/500) District Sangli on Hybrid Annuity Basis [Package PN- 41]702L + PS (SH 153)192 Cr.PWD, Maharashtra
8Independent Engineer Services for the project PN-44 – Improvements to Top Wadgaon Shigaon Aashta Tasgaon Bhivghat Atpadi Dighanchi Road, SH – 151, Km 0/000 to 127/950 (Part II- Arwade to Dighanchi Km 63/000 to Km 127/950), District Sangli on Hybrid Annuity Basis. (Package No. PN-44)64.952L+PS (SH 151)209.4 Cr.PWD, Maharashtra
9Independent Engineer Services for Improvement to Poynad Nagothane Road. SH- 87 Km.0/00 to 29/500 Taluka Alibag, Dist. Raigad on Hybrid Annuity Basis in the State of Maharashtra.29.52L + PS (SH 87)45 Cr.PWD, Maharashtra
10Independent Engineer Services for Improvement To Murud-Roha-Kolad-Pune Road Km 0+000 To Km 48+1000 in Raigad District in the State of Maharashtra Under MRIP on Hybrid Annuity Mode.48.12L+PS120 Cr.PWD, Maharashtra
11Independent Engineer Services for Improvement to Shrivardhan-Mhasala-Lonere Road Sh-99 Km.0+000 To Km.49+800. Tal. Shrivardhan, Dist. Raigad, in the State of Maharashtra Under MRIP on Hybrid Annuity Mode.49.82L+PS (SH 99)113 Cr.PWD, Maharashtra
12Consultancy Services for Authority’s Engineer for Construction and Up-gradation of NH 244 from KM 67+805 to KM 111+060 of Khellani-Kishtwar-Chatroo Section in the Union Territory of Jammu & Kashmir.43.252 Lane (NH 244)856.64 Cr.NHIDCL
13Consultancy Services for Authority’s Engineer for Up-gradation of Roads and Drainage system outside Custom bound area in J N Port, Navi Mumbai.18.5Multi-Lane319.67 Cr.Jawaharlal Nehru Port Trust