Project Management Consultancy

Sr. No Project Name Length Km Highway Classification Project Cost, Cr Client
1 Project management consultancy services to EPC contractor for Panvel Indapur section of NH-66 CH 0.000 to 84.000 84 4-Lane Divided Carriageway 500.0 Cr. JMMIPL
2 Project management consultancy for Design & construction of elevated road between Thane Belapur Road to NH4 1.6 Elevated Road/Flyover 135.2 Cr. SMC Infra
3 Project management consultancy for Design & construction of Flyover and Widening of road at Mumbra junction from CH 131/200 to 133/800 ON NH-4 2.6 Elevated Road/Flyover 89.6 Cr. SMC Infra
4 Consultancy services for Authority’s Engineer for supervision of rehabilitation & upgradation of 2/4 lane with paved shoulders for NH section Dahegaon – Kuhi – Umred of NH – 247 39 2 lane with paved shoulders 119 Cr. PWD, NH, Maharashtra / MoRTH
5 Independent Engineer Services for the Package MU-R11 Improvement to Indapur-Nizampur Mahad Karanjadi Visapur Dapoli Road SH 97 from Km 28/00 to 113/00 (excluding overlap length of 65/00 to 92/00) Dist Raigad 62 2 lane State Highway 113 Cr. PWD, Maharashtra
6 Independent Engineer Services for the Package No. MU-R07 A. Improvements to Jawhar – Wada – Bhivandi – Kalyan – Karjat Road SH- 76 Km. 110/000 to 131/000 Tal. Karjat District Raigad. B. Improvement to Gavhanphata Chirner Sai Kharpada Savroli Road S.H.104 Km 0/000 to 44/600 Dist. Raigad. 63 2 lane State Highway 145 Cr. PWD, Maharashtra
7 Independent Engineer Services for Improvements to SH143 to Vizor Nimgaon Pillv Itkai Dighnchi Shetfale Kole Ghatnadre SH 153 km 41/400 to 81/900 & 96/100 to 195/600 Dist Sangli (Part I Aatpadi to Salgare Km 65/503 to km 135/500) District Sangli on Hybrid Annuity Basis [Package PN- 41] 70 2L + PS (SH 153) 192 Cr. PWD, Maharashtra
8 Independent Engineer Services for the project PN-44 – Improvements to Top Wadgaon Shigaon Aashta Tasgaon Bhivghat Atpadi Dighanchi Road, SH – 151, Km 0/000 to 127/950 (Part II- Arwade to Dighanchi Km 63/000 to Km 127/950), District Sangli on Hybrid Annuity Basis. (Package No. PN-44) 64.95 2L+PS (SH 151) 209.4 Cr. PWD, Maharashtra
9 Independent Engineer Services for Improvement to Poynad Nagothane Road. SH- 87 Km.0/00 to 29/500 Taluka Alibag, Dist. Raigad on Hybrid Annuity Basis in the State of Maharashtra. 29.5 2L + PS (SH 87) 45 Cr. PWD, Maharashtra
10 Independent Engineer Services for Improvement To Murud-Roha-Kolad-Pune Road Km 0+000 To Km 48+1000 in Raigad District in the State of Maharashtra Under MRIP on Hybrid Annuity Mode. 48.1 2L+PS 120 Cr. PWD, Maharashtra
11 Independent Engineer Services for Improvement to Shrivardhan-Mhasala-Lonere Road Sh-99 Km.0+000 To Km.49+800. Tal. Shrivardhan, Dist. Raigad, in the State of Maharashtra Under MRIP on Hybrid Annuity Mode. 49.8 2L+PS (SH 99) 113 Cr. PWD, Maharashtra
12 Consultancy Services for Authority’s Engineer for Construction and Up-gradation of NH 244 from KM 67+805 to KM 111+060 of Khellani-Kishtwar-Chatroo Section in the Union Territory of Jammu & Kashmir. 43.25 2 Lane (NH 244) 856.64 Cr. NHIDCL
13 Consultancy Services for Authority’s Engineer for Up-gradation of Roads and Drainage system outside Custom bound area in J N Port, Navi Mumbai. 18.5 Multi-Lane 319.67 Cr. Jawaharlal Nehru Port Trust