Sr. No |
Project Name |
Length Km |
Highway Classification |
Project Cost, Cr |
Client |
1 |
Project management consultancy services to EPC contractor for Panvel Indapur section of NH-66 CH 0.000 to 84.000 |
84 |
4-Lane Divided Carriageway |
500.0 Cr. |
JMMIPL |
2 |
Project management consultancy for Design & construction of elevated road between Thane Belapur Road to NH4 |
1.6 |
Elevated Road/Flyover |
135.2 Cr. |
SMC Infra |
3 |
Project management consultancy for Design & construction of Flyover and Widening of road at Mumbra junction from CH 131/200 to 133/800 ON NH-4 |
2.6 |
Elevated Road/Flyover |
89.6 Cr. |
SMC Infra |
4 |
Consultancy services for Authority’s Engineer for supervision of rehabilitation & upgradation of 2/4 lane with paved shoulders for NH section Dahegaon – Kuhi – Umred of NH – 247 |
39 |
2 lane with paved shoulders |
119 Cr. |
PWD, NH, Maharashtra / MoRTH |
5 |
Independent Engineer Services for the Package MU-R11 Improvement to Indapur-Nizampur Mahad Karanjadi Visapur Dapoli Road SH 97 from Km 28/00 to 113/00 (excluding overlap length of 65/00 to 92/00) Dist Raigad |
62 |
2 lane State Highway |
113 Cr. |
PWD, Maharashtra |
6 |
Independent Engineer Services for the Package No. MU-R07 A. Improvements to Jawhar – Wada – Bhivandi – Kalyan – Karjat Road SH- 76 Km. 110/000 to 131/000 Tal. Karjat District Raigad. B. Improvement to Gavhanphata Chirner Sai Kharpada Savroli Road S.H.104 Km 0/000 to 44/600 Dist. Raigad. |
63 |
2 lane State Highway |
145 Cr. |
PWD, Maharashtra |
7 |
Independent Engineer Services for Improvements to SH143 to Vizor Nimgaon Pillv Itkai Dighnchi Shetfale Kole Ghatnadre SH 153 km 41/400 to 81/900 & 96/100 to 195/600 Dist Sangli (Part I Aatpadi to Salgare Km 65/503 to km 135/500) District Sangli on Hybrid Annuity Basis [Package PN- 41] |
70 |
2L + PS (SH 153) |
192 Cr. |
PWD, Maharashtra |
8 |
Independent Engineer Services for the project PN-44 – Improvements to Top Wadgaon Shigaon Aashta Tasgaon Bhivghat Atpadi Dighanchi Road, SH – 151, Km 0/000 to 127/950 (Part II- Arwade to Dighanchi Km 63/000 to Km 127/950), District Sangli on Hybrid Annuity Basis. (Package No. PN-44) |
64.95 |
2L+PS (SH 151) |
209.4 Cr. |
PWD, Maharashtra |
9 |
Independent Engineer Services for Improvement to Poynad Nagothane Road. SH- 87 Km.0/00 to 29/500 Taluka Alibag, Dist. Raigad on Hybrid Annuity Basis in the State of Maharashtra. |
29.5 |
2L + PS (SH 87) |
45 Cr. |
PWD, Maharashtra |
10 |
Independent Engineer Services for Improvement To Murud-Roha-Kolad-Pune Road Km 0+000 To Km 48+1000 in Raigad District in the State of Maharashtra Under MRIP on Hybrid Annuity Mode. |
48.1 |
2L+PS |
120 Cr. |
PWD, Maharashtra |
11 |
Independent Engineer Services for Improvement to Shrivardhan-Mhasala-Lonere Road Sh-99 Km.0+000 To Km.49+800. Tal. Shrivardhan, Dist. Raigad, in the State of Maharashtra Under MRIP on Hybrid Annuity Mode. |
49.8 |
2L+PS (SH 99) |
113 Cr. |
PWD, Maharashtra |
12 |
Consultancy Services for Authority’s Engineer for Construction and Up-gradation of NH 244 from KM 67+805 to KM 111+060 of Khellani-Kishtwar-Chatroo Section in the Union Territory of Jammu & Kashmir. |
43.25 |
2 Lane (NH 244) |
856.64 Cr. |
NHIDCL |
13 |
Consultancy Services for Authority’s Engineer for Up-gradation of Roads and Drainage system outside Custom bound area in J N Port, Navi Mumbai. |
18.5 |
Multi-Lane |
319.67 Cr. |
Jawaharlal Nehru Port Trust |