Sr. No Project Name Length Km Audit Stage Client
1 Construction of Flyover at Butibori MIDC T-Junction at Km. 26+280 on NH-44 (Old NH-7) in the state of Maharashtra 7.5 Construction & Completion Stage T&T Infra Ltd.
2 Construction of Additional Major And Minor Bridges etc. On The Basis Of Order of NGT & Revised MoEF Clearance For the Section Tamil Nadu / Kerala Border To Kanyakumari From Km. 43.000 To Km. 96.714 Section of NH-47 Under NHDP Phase-III in the State Of Tamil Nadu on EPC Mode 53.7 Construction & Completion Stage SDPL
3 Construction of new six lane Bridge at Km.368+849 on Palguni River near Kulur on Section NH-66 including approaches from Km 368+356 to Km 369+132 the State of Karnataka on EPC mode Construction & Completion Stage SDPL
4 Construction of 2/4-lanning Road – Package No. AM-93A – Amravati Ring Road Section Badnera- to Power House and Rahatgaon to Camp Short Road to M.S.H. 14 to Join SH-280 (SH 299 & SH 302) in the State of Maharashtra under MRIP on Hybrid Annuity Mode 21.8 Completion Stage Ajaydeep Infracon Pvt Ltd.
5 Construction of 2-laning with paved shoulders Road for AM-93B–Amravati-Kathora-Pusada-Shirala- Chandur Bazar Road in Amravati District to joining Riddhapur Religious place to Amravati (MDR – 27) in the State of Maharashtra under MRIP on Hybrid Annuity Mode 25.7 Completion Stage Ajaydeep Infracon Pvt Ltd.
6

Certification of Maintenance of Roads

  • Four Laning of Bharuch-Surat section of NH-8
  • Six Laning of Surat to Dahisar section NH-8
  • Four Laning of Jaipur–Tonk-Deoli section of NH-12
  • Four Laning of Talegaon-Amravati section of NH-6
  • Six Laning of Tumkur-Chitradurga section of NH-4
  • Four Laning of Salem-Namakkal Bypass section of NH-7
  • Four Laning of Pathankot-Amrutsar section of NH-15
804.1 O&M Stage IRB Infrastructures

Proof Checking Services

Sr. No Project Name Length Km Highway Classification Project Cost, Cr Client
1 Upgradation of Section-II Patgaon to Khopoli (Km 69/508-91/139) part of NH- 3-Shahpur – Murbad (NH-222) – Mhapsa –Karjat – Khopoli –
NH4 section of newly declared NH- 548A (in the State of Maharashtra.
21.6 2L+PS T&T Infra Pvt Ltd. MSRDC/ MoRTH
2 Rehabilitation and Up-gradation of Malkapur-Buldhana-Chikhli-Deulgaonraja-
Jalna (Aurangabad) NH-753-A Road [Section-
I :Chikhli to Deulgaon Mahi (Takarkhed Bhagile)]
39.6 4L + PS Kalathia Const. Pvt. Ltd. NH-PWD/ MoRTH
3 Proof Checking for Design & construction of elevated road between Thane Belapur Road to NH4 1.6 4 Lane Flyover SMC Infra MMRDA
4 Proof Checking for Design & construction of Flyover and Widening of road at Mumbra junction from CH 131/200 to 133/800 ON NH-4 2.6 4 Lane Flyover SMC Infra MMRDA
5 Proof Checking for Construction of South Bound Flyover at the Junction of Andheri Ghatkopar Link Road on Eatern Express Highway 1.6 4 Lane Flyover SMC Infra MMRDA
6 Balance work under Phase-I for 4 laning of Khed Sinner Section of NH-50 (New NH-60) comprising of the stretches Khed Bypass (km
42.000 to km 46.981), Peth (km 56.100 to km 56.780), Manchar bypass and linear length of Eklahre from km 60.100 to km 68.576 (Total Length -14.137 km) of Pune District
in the State of Maharashtra on EPC Mode
14.1 4L + PS T&T Infra Pvt Ltd. NHAI
7 Construction of Additional Cross Drainage Structures Across Water Tank Areas i.e. Major And Minor Bridges etc. On The Basis Of Order of NGT & Revised MoEF Clearance For the Section Tamil Nadu / Kerala Border To Kanyakumari From Km.
43.000 To Km. 96.714 Section of NH-47 Under NHDP Phase-III in the State Of Tamil Nadu on EPC Mode
53.71 4L + PS SDPL NHAI